A 580' long L shaped breakwater-wall with jetty-platforms erected at the foot of its inner slopes.

A 580' long L shaped breakwater-wall with jetty-platforms erected at the foot of its inner slopes.

Still another essential preliminary work to be executed urgently was the erection of jetty-platforms, one on the shore and the other at the foot of the Rock to facilitate ferrying of workmen as well as transportation of building material to the Rock.
In this vital work, the Committee was greatly helped by the State goverment of Tamil Nadu through the State P.W.D.
On the shore-side, an L shaped breakwater-wall of about 580' in length was put up by them to enable the Committee to erect jetty platforms at the foot of the inner slopes of the curved breakwater-wall.
On the Rock-side, they deepended and widened an existing creek to provide sheltered water for the vessels. Both these works cost the P.W.D. over Rs. 4 lakhs.