Supply of Power

The cable-reel arrived at the Rock-jetty after the laying of the cable -line in the sea-bed.

The cable-reel arrived at the Rock-jetty after the laying of the cable -line in the sea-bed.

A diffcult but an urgent task to be executed to facilitate construction work on the Rock was some arrangement for the supply of electric power from the shore to the Rock.
The Committee preferred to lay a submarine cable in the sea-bed for that purose. They laying of about 1600 feet cable line in the intervening seabed to take power from teh shore to the Rock, was executed by the State Electricity Board of Tamil Nadu.